Watch how our solutions transform operations and explore step-by-step installation guides
Proof that AGAT meets aviation authority requirements
Complete specifications: pile height, drainage rate, load-bearing capacity, temperature range, UV stability, and material composition.
Download
Complete specifications: pile height, drainage rate, load-bearing capacity, temperature range, UV stability, and material composition.
Download
Complete specifications: pile height, drainage rate, load-bearing capacity, temperature range, UV stability, and material composition.
Download
Complete specifications: pile height, drainage rate, load-bearing capacity, temperature range, UV stability, and material composition.
Download
Proof that AGAT meets aviation authority requirements
Proof that AGAT meets aviation authority requirements
20+ years with minimal maintenance. Our oldest installations (20+ years) show no significant degradation. Compare that to natural grass (constant maintenance) or concrete (cracking after 10-15 years).
Yes. AGAT is FAA compliant and has been approved by FAA, CAA UK, ICAO and multiple NATO facilities. We provide all compliance documentation for your procurement team.
Most helipad installations: 3-5 days. Landing strips: 2-4 weeks depending on size. Compare that to concrete (months of curing) or grass (growing season required).
Absolutely. Proven operational from -50°C to +60°C. Our Greenland installations face Arctic winters, and our Abu Dhabi installation handles desert heat. If it works there, it works anywhere.
Minimal. Visual FOD inspections (you're doing these anyway), occasional brushing to keep pile upright, and periodic cleaning. No mowing, no watering, no herbicides, no resurfacing.
Let's talk about your specific facility, challenges, and goals. We'll help you figure out the best approach.
© 2026 Evergreen Aviation. All rights reserved.